Throughout the planning with the working System and prior to the start of the drilling, an investigation need to be carried out to guarantee the absence of any obstructions for the pile locations. Demolition of the surplus concrete over the Slice-off level shall be carried out by operatives making use https://claytonnhapf.imblogs.net/82332260/the-single-best-strategy-to-use-for-cast-in-situ-piles